120149

Cinder removing facility with gantry crane

Cinder removing facility with gantry crane Standard 1
*To enlarge, click on the pictures.
Cinder removing facility with gantry crane [-de-] freigestellt 1
Cinder removing facility with gantry crane [-de-] freigestellt 2
Kit includes a gantry crane, 2 heated swivel water spouts (DB NW 200), 2 slag hoppers, 1 ground plate (344 mm) with slag pit, rolling slag carriage, and bucket. Above the slag pit the ground plate is provided with two driving rails. It can be connected to all types of tracks, even those with middle conductor, except Märklin’s C track. Combining two inspection pits (120136) allows to build a two-track deslagging plant with a parallel track distance of 67 mm, matching that of the bunker (120148). Such an installation allows the gantry crane to span 3 tracks – 2 slag pits and 1 track for slag wagons.
This building kit contains: 69 single parts in 2 colours and 1 construction instruction.
Use for handicrafts FALLER - plastic glue.
51.99 €
incl. VAT
immediately available
Characteristics
Level of difficulty
Beginners
Category
Railway technical buildings
Period II
1921 - 1945
Dimensions
Dimensions:
344 x 147 x 102 mm
Shopping Cart
Article Quantity: 0
Total: 0.00 
display
Quick Order
Track gauges     Themes
Our brands